Pump Motor Installation
WARNING: This page is about a different car, the 2017 Jeep Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
The pump motor assembly O-rings must be replaced. The O-rings are of different size and must not be interchanged. The red O-ring (3) goes on first and is nearest the pump flange, followed by the blue O-ring (4) that sits nearest the outboard edge.
- Install NEW
pump motor O-rings.
- Install the pump motor assembly (1) onto the Rear Driveline Module (RDM).
- Install the three pump motor bolts (1) and uniformly finger tighten until the pump motor assembly is fully seated to housing. Tighten to the proper torque. Refer to TECHNICAL SPECIFICATIONS .
- Connect the pump motor wire harness connector (2).CAUTION:
Do not mix hydraulic fluid and the RDM lubricant. Use only recommended fluid to prevent damage to Rear Driveline Module components. Fluid must meet material specification MS-2155.
- Top off the hydraulic fluid and bleed the hydraulic system. Refer to FLUID, HYDRAULIC, STANDARD PROCEDURE .