Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2017 >> Grand Cherokee Laredo, AWD >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> 8HP45/845RE Automatic Transmission (Service Information) >> Valve, Coolant Control >> Installation

Valve, Coolant Control: Installation

GC0173692Courtesy of CHRYSLER GROUP, LLC
  1. Install the coolant control valve and bracket assembly (2) tighten the bolt (3) to the proper torque specifications. Refer to TORQUE SPECIFICATIONS  .
    GC0173572Courtesy of CHRYSLER GROUP, LLC
  2. Install the coolant lines (2) to the coolant control valve.
  3. Connect the coolant control valve wire harness connector (1).
  4. Install the cowl extension silencer. Refer to SILENCER, COWL EXTENSION, INSTALLATION .
  5. Fill the coolant system. Refer to STANDARD PROCEDURE .
  6. Connect the negative battery cable.