Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2012 >> Compass Latitude, 2.4 B, FWD, Automatic CVT >> Repair and Diagnosis >> External Pages >> Different car >> Section 191 (Electronic Control Modules (Service Information)) >> Module, Telematics Gateway >> Installation >> Installation

Module, Telematics Gateway: Installation: Installation

WARNING: This page is about a different car, the 2012 Dodge Charger. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Antenna(s), Video Cable, RF HUB, Wiring Connectors And UCI Cables
GC0144027Courtesy of CHRYSLER GROUP, LLC
NOTE:

Mid level shown in illustration, base similar.

  1. Position the Telematics Gateway Module (TGM) close to the instrument panel to connect the electrical connectors.
  2. If equipped, connect the antenna(s) (1), RF HUB and UCI cables (4), video cable (3) and wiring connectors (2) to the TGM.
    Fig 2: Telematics Gateway Module (TGM) & Retainers
    GC0145002Courtesy of CHRYSLER GROUP, LLC
  3. Install the TGM (2) retainers (1).
  4. Install the switch bank. Refer to POD, SWITCH BANK, INSTALLATION .
    Fig 3: Instrument Panel Screw & Cluster Bezel
    GC0145001Courtesy of CHRYSLER GROUP, LLC
  5. Install the instrument cluster bezel. Refer to BEZEL, INSTRUMENT CLUSTER, INSTALLATION .
  6. Connect the negative battery cable.
  7. Restore user data from backup. Refer to STANDARD PROCEDURE .