Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2010 >> Compass Limited, ED3, FWD, Automatic CVT >> Repair and Diagnosis >> Transmission >> Transfer Case >> Power Transfer Unit >> SHIELD, Extension Housing Dust >> Installation >> Installation

SHIELD, Extension Housing Dust: Installation: Installation

Fig 1: DUST SHIELD ON PTU MK
GC0084423Courtesy of CHRYSLER LLC
  1. Using a block of wood (2) install the dust shield (3) onto the extension housing (1).
    Fig 2: EXTENSION AND PINION HOUSING BOLTS
    GC0084387Courtesy of CHRYSLER LLC
  2. Install the extension housing and bolts.
  3. Tighten the extension housing bolts to 38 N.m (28 ft. lbs.).
  4. Install the propeller shaft. Refer to Differential and Driveline/Propeller Shaft - Installation .