Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2009 >> Wrangler X, Standard >> Repair and Diagnosis >> Engine Performance >> System >> DTCS P0579 To P0645 - NGC >> P0592-Speed Control Switch 2 Circuit Low >> Diagnostic Test

Diagnostic Test

  1. ACTIVE DIAGNOSTIC TROUBLE CODE (DTC) 
    1. Start the engine and allow it to idle for at least 60 seconds.
      WARNING: When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing. Failure to follow these instructions may result in possible serious or fatal injury.
      NOTE: It may be necessary to test drive the vehicle and operate the speed control in order for this DTC to set.
    2. With a scan tool, select View DTCs.

      Is the DTC Active at this time?

      Yes 

      • Go to step  2

      No 

  2. SPEED CONTROL SWITCH 
    1. Using the scan tool, monitor the Speed Control Switch voltage.
    2. Disconnect the Speed Control Switch harness connector.

      Did the voltage change to above 4.7 Volts?

      Yes 

      No 

      • Go to step  3
  3. (V72) S/C SIGNAL 2 CIRCUIT SHORTED TO GROUND 
    Fig 1: Checking S/C Signal Circuit
    GC0102038Courtesy of CHRYSLER LLC
    1. Turn the ignition off.
    2. Disconnect the C3 PCM harness connector.
    3. Measure the resistance between ground and the (V72) S/C Signal 2 circuit in the Switch harness connector.

      Is the resistance below 100 Ohms?

      Yes 

      No 

      • Go to step  4
  4. (V72) S/C SIGNAL 2 CIRCUIT SHORTED TO THE (V937) S/C SWITCH GROUND CIRCUIT 
    Fig 2: Checking S/C Signal Circuit
    GC0102036Courtesy of CHRYSLER LLC
    1. Measure the resistance between the (V72) S/C Signal 2 circuit and the (V937) S/C Switch Ground circuit in the Switch harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      No 

      • Go to step  5
  5. EXCESSIVE RESISTANCE IN THE (V72) S/C SIGNAL 2 CIRCUIT 
    Fig 3: Checking S/C Signal 2 Circuit
    GC0102035Courtesy of CHRYSLER LLC
    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install PCM Pinout Box 8815 to perform diagnosis.
    1. Measure the resistance of the (V72) S/C Signal 2 circuit from the Speed Control Switch to the appropriate terminal of PCM Pinout Box 8815.

      Is the resistance below 5.0 Ohms for each measurement?

      Yes 

      • Go to step  6

      No 

  6. SPEED CONTROL SWITCH VOLTAGE VALUES 
    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install PCM Pinout Box 8815 and PCM Pinout Box Adapter 8815-1 to perform diagnosis.
    1. Using a Voltmeter check the voltage on the (V38) S/C Signal 2 circuit at the appropriate terminals of the PCM Pinout Box 8815.
      WARNING: When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing. Failure to follow these instructions may result in possible serious or fatal injury.
    2. Start the engine and allow it to reach normal operating temperature.
    3. Monitor the Voltmeter.
    4. Allow the engine to idle.
    5. With a scan tool, monitor the S/C Switch voltage readings.
      SWITCH POSITION  SWITCH No. 1 VOLTAGE VALUE  SWITCH No. 2 VOLTAGE VALUE 
      NO SWITCHES PRESSED 4.31 to 4.78 Volts 4.31 to 4.78 Volts
      ON/OFF PRESSED 0.59 to 1.13 Volts 3.53 to 3.92 Volts
      RES/ACCEL PRESSED 3.88 to 4.17 Volts 2.04 to 2.47 Volts
      SET PRESSED 3.16 to 3.56 Volts 1.17 to 1.56 Volts
      COAST PRESSED 2.57 to 2.94 Volts 0.77 to 1.09 Volts
      CANCEL PRESSED 1.59 to 1.99 Volts 2.84 to 3.25 Volts
    6. Compare the voltage readings on the Voltmeter to what the scan tool displayed.

      Are the voltage readings out of the listed specification and is there less than a 0.2 of a Volt difference between the Voltmeter switch values and the scan tool switch values?

      Yes 

      No 

      • Go to step  7
  7. POWERTRAIN CONTROL MODULE (PCM) 
    1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Speed Control Switch and the Powertrain Control Module (PCM).
    2. Look for any chafed, pierced, pinched, or partially broken wires.
    3. Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the Switch and Powertrain Control Module connectors.
    4. Perform any Technical Service Bulletins that may apply.

      Were there any problems found?

      Yes 

      No