Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Jeep >> 2006 >> Commander Base, 3.7 K, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (5.7L Engine (Service Information)) >> Manifold - Intake >> Installation >> Installation

Installation

WARNING: This page is about a different variant/trim than selected.
  1. Position intake manifold.
  2. Install intake manifold retaining bolts, and tighten in sequence from the middle bolts towards the outside in a crisscross pattern. Torque fasteners to 12 N.m (105 in. lbs.).
  3. Install EGR tube.
  4. Install wire harness on intake manifold.
  5. Connect electrical connectors for the following components:
    1. Manifold Absolute Pressure (MAP) Sensor
    2. Fuel Injectors
    3. ETC ( Electronic Throttle Control )
    Fig 1: 5.7L Engine Appearance Cover
    GC0027263Courtesy of DAIMLERCHRYSLER CORP.
  6. Install ignition wires.
  7. Connect Brake booster hose, purge hose, and MUA hose ( Make Up Air hose ).
  8. Install air inlet hose.
  9. Connect negative cable to battery.
  10. Install engine cover (1).