Transmission Control Module (TCM) and Main Control Valve Body - In-Vehicle Procedures: Installation
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2009 Jaguar XKR, 2009 Jaguar XK8, 2008 Jaguar XKR, 2008 Jaguar XK8, and 2007 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.
- Install the valve body.
- Clean the component mating faces.
- Install new seals.
- Install a new seal block.
- Tighten the Torx screws to 8 Nm (6 lb.ft).
- Install a new electrical connector sleeve.
- Secure with retainer.
- Connect the electrical connector.
- Install the fluid pan. See Fluid Pan, Gasket and Filter .
- Connect the battery ground cable. Refer to Specifications article.
- Using WDS, calibrate a new TCM and valve body.
CAUTION:
Make sure that when fully fitted, all seals protrude by the same amount.
CAUTION:
Engage the selector lever with the groove in the piston rod.