Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Infiniti >> 2005 >> G35 x >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 7 (Engine Control System - Coupe) >> DTC P1706: PNP Switch >> Overall Function Check >> With GST

With GST

WARNING: This page is about a different variant/trim than selected.
  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    PNP SWITCH SIGNAL VOLTAGE

    Condition (Shift lever) Voltage (Known good data)
    P or N position (A/T) Approx.0V
    Neutral position (M/T) -
    Except above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to Diagnostic Procedure .
    Fig 1: Checking Voltage Between ECM Terminal 102 & Ground
    G02334094Courtesy of NISSAN MOTOR CO., U.S.A.