Circuit Inspection
■ Check voltage
- IG "OFF" & Disconnect fuel rail pressure sensor connector.
- IG "ON".
- Measure voltage between power, signal, ground terminal of fuel rail pressure sensor harness connector and chassis ground.
Specification: power - approx. 5V, signal - approx. 5V, ground - approx. 0V
- Is the measured voltage within specification?
YES
- Go to "Component Inspection " procedure below.
NO
- Repair open or short in fuel rail pressure sensor circuit and go to "Verification of Vehicle Repair " procedure.