Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Hyundai >> 2017 >> Azera Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (1 Of 3) >> DTC P0118: Engine Coolant Temperature Circuit High Input >> W/Harness Inspection >> Signal Circuit Inspection

Signal Circuit Inspection

■ Check voltage 

  1. IG "OFF" and disconnect ECTS connector.
  2. IG "ON"
  3. Measure voltage between signal terminal of ECTS harness connector and chassis ground.

    Specification:  Approx. 3.3V

    Fig 1: Measuring Voltage Between Signal Terminal Of ECTS Harness Connector And Chassis Ground
    G12087557Courtesy of HYUNDAI MOTOR AMERICA
  4. Is the measured voltage within specification?

    YES 

    NO 

    • If the voltage is 0V, go to "Check open in harness" as follows. If the voltage is more than 5.1V, repair short to battery in harness and go to "Verification of Vehicle Repair " procedure.

■ Check open in harness 

  1. IG "OFF" and disconnect ECTS connector and PCM connector.
  2. Measure resistance between signal terminal of ECTS harness connector and ECTS signal terminal of PCM harness connector.

    Specification:  below 1 Ω

    Fig 2: Measuring Resistance Between Signal Terminal Of ECTS Harness Connector And ECTS Signal Terminal Of PCM Harness Connector
    G12087558Courtesy of HYUNDAI MOTOR AMERICA
  3. Is the measured resistance within specification?

    YES 

    NO