Ground Circuit Inspection
- IG KEY "OFF".
- Disconnect IATS connector.
- IG KEY "ON" & ENG "OFF"
- Measure the voltage between signal terminal of IATS harness connector and chassis ground.(A)
- Measure the voltage between signal and ground terminal of IATS harness connector and chassis ground.(B)
Specification: The Difference between "A" and "B" is below 200mV.
3
- Is the measured voltage within specification?
YES
- Go to "Component Inspection" procedure below.
NO
- Check for Open in ground circuit. Repair as necessary and then go to "Verification of Vehicle Repair " procedure.