Control Circuit Inspection
- IG "OFF" and disconnect the METAL CORE BLOCK (PCB #1) connector and ECM connector.
- Measure the resistance between control terminal of main relay harness connector (METAL CORE BLOCK (PCB #1) connector) and main relay control terminal of ECM harness connector.
Specification: Approx. below 1Ω
- Is the measured resistance within specification?
YES
- Go to "CONTROL RELAY POWER CIRCUIT INSPECTION " as follows.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.