Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Hyundai >> 2010 >> Azera GLS >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (3 Of 3) >> DTC P0660: Intake Manifold Tuning Valve Control Circuit Open (Bank 1) >> Inspection/Repair >> W/Harness Inspection >> Control Circuit Inspection

Control Circuit Inspection

  1. Check voltage
    1. IG "OFF" and disconnect VIS connector.
    2. IG "ON" and ENG "OFF"
    3. Measure voltage between terminal 2 of VIS harness connector and chassis ground.

      Specification:  Approx. 2.5V

      Fig 1: Measuring Voltage Between Terminal 2 Of VIS Harness Connector And Chassis Ground
      G06804578Courtesy of HYUNDAI MOTOR CO.
    4. Is the measured voltage within specification?

      YES 

      NO 

      • Go to " 2 Check short in harness" as follows.
  2. Check short in harness
    1. IG "OFF" and disconnect VIS connector and PCM connector.
    2. Measure resistance between terminal 2 of VIS harness connector and chassis ground.
    3. Measure resistance between terminals 1 and 2 of VIS harness connector.

      Specification:  Infinite

      Fig 2: Measuring Resistance Between Terminals 1 And 2 Of VIS Harness Connector
      G06804579Courtesy of HYUNDAI MOTOR CO.
    4. Is the measured resistance within specification?

      YES 

      • Go to " 3 Check open in harness" as follows.

      NO 

  3. Check open in harness
    1. IG "OFF" and disconnect VIS connector and PCM connector.
    2. Measure resistance between terminal 2 of VIS harness connector and terminal 71 of PCM harness connector.

      Specification:  Below 1Ω

      Fig 3: Measuring Resistance Between Terminal 2 Of VIS Harness Connector And Terminal 71 Of PCM Harness Connector
      G06804580Courtesy of HYUNDAI MOTOR CO.
    3. Is the measured resistance within specification?

      YES 

      NO