Check Open In Harness
- IG "OFF" and disconnect CCV connector and PCM connector.
- Measure resistance between control terminal of CCV harness connector and CCV control terminal of PCM harness connector.
Specification : Below 1 Ω
- Is the measured resistance within specifications?
YES:
- Go to "COMPONENT INSPECTION " procedure.
NO:
- Check open in harness between CCV connector and PCM connector.
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.