Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Hyundai >> 2007 >> Tucson GLS, 4WD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Fuel System (G4GC - GSL 2.0) >> DTC Troubleshooting Procedures >> Specification >> Power Supply Circuit Inspection

Power Supply Circuit Inspection

  1. Ignition "ON" & Engine "OFF".
  2. Measure voltage between terminal 1 of the injector harness connector and chassis ground.

    Specification: Approx. B+

    Fig 1: Measuring Voltage Between Terminal 1 Of Injector Harness Connector And Chassis Ground
    G04810793Courtesy of HYUNDAI MOTOR CO.
  3. Is voltage within the specification?

    YES  : --> Go to "CONTROL CIRCUIT INSPECTION " procedure.

    NO  : --> Check for a open in the power supply circuit between the main relay and the Injector.

    Check for open or blown 15A injector fuse.

    Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.