Ground Circuit Inspection
- IG "OFF" and disconnect MAFS connector and then IG "ON".
- Measure voltage between terminal 1 of MAFS harness connector and chassis ground.
- Measure voltage between terminal 1 and 3 of MAFS harness connector.
Specification: Voltage difference between Measurement "A" and "B" is below 200m V.
- Is the measured voltage within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair contact resistance or open in harness and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.