Power Circuit Inspection
- IG "OFF" and disconnect OCV connector.
- IG "ON" & ENG "OFF".
- Measure voltage between terminal 1 of OCV harness connector and chassis ground.NOTE: Be careful not to change the connectors for B1 and B2
Specification: B+
- Is the measured voltage within specification?
YES
- Go to "CONTROL CIRCUIT INSPECTION " procedure.
NO
- Check that Fuse between Main Relay and OCV is open.
- Check open between main relay and OCV.
- Check short to ground between Main Relay and OCV.
- Repair or replace as necessary go to "VERIFICATION OF VEHICLE REPAIR " procedure.