Signal Circuit Inspection
- Check CAN BUS Short to Ground.
- Key "OFF".
- Disconnect ECM/PCM connector.
- Measure the resistance between terminal 12/C01-2 of ECM/PCM harness connector and chassis ground. [A/T]
Measure the resistance between terminal 84/C01 of ECM/PCM harness connector and chassis ground. [M/T]
- Measure the resistance between terminal 27/C01-2 of ECM/PCM harness connector and chassis ground. [A/T]
Measure the resistance between terminal 62/C01 of ECM/PCM harness connector and chassis ground. [M/T]
Specification: Infinite
Courtesy of HYUNDAI MOTOR CO.
- Is the measured resistance within specification?
YES : --> Go to "CAN BUS Terminus Resistance Check (Harness side)" procedure.
NO : --> Repair Short in signal circuit and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- CAN BUS Terminus Resistance Check (Harness side)
- Key "OFF".
- Disconnect ECM/PCM connector.
- Measure the resistance between terminal 12 and 27 of ECM/PCM harness connector. (C01-2) [A/T]
Measure the resistance between terminal 84 and 62 of ECM/PCM harness connector. (C01) [M/T]
Specification: 120 ± 10Ω
Courtesy of HYUNDAI MOTOR CO.
- Is the measured resistance within specification?
YES : --> Go to "COMPONENT INSPECTION " procedure.
NO : --> In case the measured resistance is around 1.0Ω: Repair Short in signal circuit and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
--> In case the measured resistance is Infinite: Repair Open in signal circuit and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.