Signal Circuit Inspection: Notes
- Ignition "ON" & Engine "OFF".
- Measure voltage between terminal 2 of the FLS harness connector and chassis ground. 1)
Specification: Approx. 0V
- Is resistance within the specification?
YES : --> Go to next step as below.
NO : --> Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.