Component Inspection
- A/C relay check
- Key "OFF".
- Disconnect A/C relay.
- Measure the resistance between terminal 1 and 2 of A/C relay component side.
- Measure the resistance between terminal 3 and 5 of A/C relay component side.A/C RELAY SPECIFICATION
Terminal Continuity 1 ~ 2 NO 3 ~ 5 YES (Approx. 70 ~ 120Ω) - Is the measured resistance within specification ?
YES : --> Substitute with a known - good ECM/PCM and check for proper operation. If the problem is corrected, replace ECM/PCM and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NO : --> Substitute with a known - good A/C relay and check for proper operation. If the problem is corrected, replace A/C relay and go to "VERIFICATION OF VEHICLE REPAIR " procedure.