Removal Procedure
- Disconnect the energy storage box (ESB). Refer to Energy Storage Box (ESB) Service Disconnect/Connect (5.3L Engine w/RPO HP2) .
- Remove the ESB intermediate cover. Refer to Energy Storage Box (ESB) Intermediate Cover Replacement (5.3L Engine w/RPO HP2) .
- Remove the control module nuts.
- Lift the control module up off of the studs.
- Disconnect the control module electrical connectors.
- Remove the control module.