Smart Junction Box (SJB): Installation
WARNING: This page is about a different variant/trim than selected.
- Position the SJB and install the 3 nuts.
- Tighten to 5 Nm (44 lb-in).
- Connect the 7 electrical connectors.
- Download the SJB configuration information from the scan tool to the SJB. For additional information, refer to MODULE CONFIGURATION .
- Train the tire pressure sensors. For additional information, refer to WHEELS AND TIRES .
- Carry out the SJB self-test (must include an on-demand self-test) and then repeat the self-test to confirm all DTCs have been cleared.
- Rotate the instrument panel dimmer switch from the full dim position to the dome ON position. This makes sure that all the displays are visible under all lighting conditions.
NOTE:
If the SJB is not being replaced, this is the last step that is necessary.
NOTE:
DTC B2276 may be set, indicating there are less than 2 transmitters programmed to the SJB. For additional information, refer to
HANDLES, LOCKS, LATCHES AND ENTRY SYSTEMS
.
NOTE:
DTC C2780 does not clear if any other DTCs are present in the SJB.