Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Ford >> 2003 >> Windstar Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 228 (Climate Control System) >> Removal And Installation >> Compressor Manifold and Tube Assembly - 3.9L >> Material

Compressor Manifold and Tube Assembly - 3.9L: Material

WARNING: This page is about a different car, the 2003 Lincoln LS. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Material Specification Chart
G01183147Courtesy of FORD MOTOR CO.
NOTE: Installation of a new receiver drier is not required when repairing the air conditioning system except when there is physical evidence of contamination from a failed A/C compressor or damage to the receiver drier.
NOTE: New O-ring seals, lubricated in clean PAG oil, must be installed before reconnecting any A/C fitting that has been disconnected.
  1. Recover the refrigerant. For additional information, Refer to AIR CONDITIONING (A/C) SYSTEM RECOVERY, EVACUATION AND CHARGING .
  2. Position the vehicle on a hoist with the gear selector in NEUTRAL  .
  3. Remove the center deflector shield.
  4. Remove the components in the order indicated in Fig 2.
  5. To install, reverse the removal procedure.
    Fig 2: Removing Sequence Of Compressor Manifold and Tube Assembly - 3.9L Components
    G01183148Courtesy of FORD MOTOR CO.
  6. Lubricate the refrigerant system with the correct amount of clean PAG oil. For additional information, Refer to REFRIGERANT OIL ADDING .
  7. Evacuation, leak test and charge the refrigerant system. For additional information, Refer to AIR CONDITIONING (A/C) SYSTEM RECOVERY, EVACUATION AND CHARGING .