Purging Test Hoses
- Be sure high and low side hoses are properly connected to service valves and all hose connections are tight.
- If stem-type service valves are used, turn stems inward 1 1/2 to 2 turns to mid-position. Place clean shop towel over end of center service hose.
- Now purge high side test hose by opening hand valve on the high side gauge for 3-5 seconds. This allows system's refrigerant to force air through test hoses and out center service hose into the shop towel. Immediately close high side gauge hand valve.
- Purge low side test hose in the same manner, using hand valve of low side gauge. Close hand valve after 3-5 seconds. Purging of test hoses is complete. System is ready for testing.