Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Fiat >> 2012 >> 500 Lounge, Automatic Trans >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery (Service Information) >> Tray, Battery >> Installation >> Installation

Tray, Battery: Installation: Installation

Fig 1: Battery Tray, Connectors, Retainers, Nut & Bolts
GC0152563Courtesy of CHRYSLER GROUP, LLC
  1. Install the battery tray (3) with one nut (5) and two bolts (1). Tighten all three fasteners to 25 N.m (18 ft. lbs.).
  2. Engage the engine wire harness connector (2) to the battery tray (3).
  3. Engage two engine wire harness retainers (4) to the battery tray (3).
  4. Engage two starter wire harness retainers (6) to the battery tray (3).
    Fig 2: PCM Electrical Connectors
    GC0152393Courtesy of CHRYSLER GROUP, LLC
  5. Connect the powertrain control module (PCM) electrical connectors (1 and 2).
    Fig 3: Battery Thermo Cover & Battery
    GC0152855Courtesy of CHRYSLER GROUP, LLC
  6. Install the battery (2). Refer to BATTERY, INSTALLATION .