Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Dodge and Ram >> 2023 >> ProMaster 3500 Van Cargo Extended >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Communication Devices >> Electronic Control Modules (Service Information) >> Module, Global Telematics Box >> Installation >> Installation

Module, Global Telematics Box: Installation: Installation

GC0203930Courtesy of CHRYSLER GROUP, LLC
  1. Install the Global Telematics Box Module (TBM2) (3) to the center bracket (2).
  2. Install the fasteners (1) that secure the TBM2 (3).
  3. Connect the wire harness connectors and Antenna connectors to the TBM2.
    GC0203936Courtesy of CHRYSLER GROUP, LLC
  4. Install the center bracket (2) into the instrument panel.
  5. Install the center brackets fasteners (1) and tighten securely.
  6. Install the instrument panel cupholder. Refer to CUPHOLDER, INSTRUMENT PANEL, INSTALLATION .
  7. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.