Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, ED3 >> Repair and Diagnosis >> External Pages >> Different car >> Section 60 (Charging System (Service Information)) >> Generator >> Installation >> 3.5L

Section 60 (Charging System (Service Information)): Generator: Installation: 3.5L

WARNING: This page is about a different car, the 2010 Dodge Avenger and 2010 Chrysler Sebring. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: MOUNTING BOLTS
GC0120982Courtesy of CHRYSLER LLC
  1. Install generator.
  2. Install mounting bolts and tighten to 26 N.m (19 ft. lbs.).
    Fig 2: CABLE CONNECTIONS
    GC0120983Courtesy of CHRYSLER LLC
  3. Install battery cable. Tighten nut to 10 N.m (88.5 in. lbs.
  4. Connect electrical connector to generator.
  5. Install access drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Installation .
  6. Install negative battery cable remote terminal onto remote battery post. Tighten nut to 16.5 N.m (12 ft. lbs.).