Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> External Pages >> Different car >> Section 59 (Emissions Control System) >> On-Board Diagnostics >> Task Manager >> Operation >> Operation - Task Manager >> Priorities

Operation - Task Manager: Priorities

WARNING: This page is about a different car, the 2006 Chrysler Crossfire. However, it is still accessible from the selected car via links, so may be relevant.

Non-emissions related failures have no priority. One trip failures of two trip faults have low priority. Two trip failures or matured faults have higher priority. One and two trip failures of fuel system and misfire monitor take precedence over non-fuel system and non-misfire failures.