Enabling Ignition & Fuel Systems
WARNING: This page does not describe the selected car, but rather 23 other vehicles, including the 2000 Plymouth Voyager, 2000 Plymouth Neon, 2000 Plymouth Grand Voyager, 2000 Plymouth Breeze, and 2000 Dodge Stratus. However, it is still accessible from the selected car via links, so may be relevant.
When testing and/or repairs have been completed, verify battery condition. Recharge battery as necessary, after starter tests have been completed. Disconnect all test equipment. Install ASD relay. On 5.9L diesel engines, reconnect fuel shutdown solenoid connector. On all models, start engine several times to verify malfunction has been corrected.