Installation Procedure
Power Transfer Unit Shift Actuator Seal (3) - Install NEW
- Power Transfer Unit Shift Actuator (2) - Install
- Power Transfer Unit Shift Actuator Bolt (1) - Install and tighten - Fastener Specifications
- Connect the electrical connectors and install the wiring harness retainers as necessary.
- Install underbody panels as necessary. Underbody Panel Component Locator
CAUTION:
Refer to Fastener Caution .