Knock Sensor Replacement - Bank 2
NOTE:
Callouts items in the following chart represent components shown in graphic above.
| Callout | Component Name |
|---|---|
| Preliminary Procedure Warm Up Three-Way Catalytic Converter Replacement (LH - LGX) , or Warm Up Three-Way Catalytic Converter Replacement (RH - LGX) |
|
| 1 | Electrical Connector |
| 2 | Knock Sensor Bolt
CAUTION:
Refer to Fastener Caution . Tighten 25 N.m (18 lb ft) |
| 3 | Knock Sensor |