Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Chevrolet >> 2018 >> Traverse RS >> Repair and Diagnosis >> External Pages >> Different car >> Section 19 (Battery, Starting And Charging System) >> Repair Instructions >> Generator Replacement (LFY) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2019 Chevrolet Traverse. However, it is still accessible from the selected car via links, so may be relevant.
  1. GM4732390Courtesy of GENERAL MOTORS COMPANY

    Generator (3) - Install

  2. CAUTION:

    Refer to Fastener Caution

  3. Generator Mounting Stud (1) - Install and tighten [2x] 9 N.m (80 lb in)
  4. Generator Mounting Nut (2) - Install and tighten [2x] 58 N.m (43 lb ft)
  5. GM4732374Courtesy of GENERAL MOTORS COMPANY

    Electrical Connector (1) - Connect

  6. GM4728880Courtesy of GENERAL MOTORS COMPANY

    Battery Positive Cable (2) - Install

  7. Generator Fastener (1) - Install and tighten 15 N.m (11 lb ft)
  8. Belt Idler Pulley - Install - Belt Idler Pulley Replacement
  9. Install the intake manifold cover. Intake Manifold Cover Replacement
  10. Connect the battery negative cable. Battery Negative Cable Disconnection and Connection (KL9)