Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Chevrolet >> 2016 >> Volt Premier >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Positive and Negative Cable Replacement (12 V Battery to Accessory DC Power Control Module) >> Installation Procedure

Installation Procedure

    Fig 1: Battery Negative Cable Ground Fastener
    GM4629007Courtesy of GENERAL MOTORS COMPANY
  1. Install Battery Positive and Negative Cable (2)
  2. Install Battery Negative Cable Ground Fastener (1) @Battery Tray (3) and tighten 22 N.m (16 lb ft)
  3. Fig 2: Battery Positive Cable And Nut
    GM4629004Courtesy of GENERAL MOTORS COMPANY
  4. Install Battery Positive Cable Nut (4) @Battery Distribution Fuse Block (5) and tighten 15 N.m (133 lb in)
  5. Install Battery Positive Cable Nut (1) @Accessory DC Power Control Module (2) and tighten 22 N.m (16 lb ft)
  6. Engage Retainer (3)
  7. Fig 3: Battery Fuse Block Cover And Retaining Tabs
    GM4091072Courtesy of GENERAL MOTORS COMPANY
  8. Install Battery Fuse Block Cover (2)
  9. Check the 2 locked retaining tabs (1).
  10. Fig 4: Panel Trim And Nuts
    GM4091071Courtesy of GENERAL MOTORS COMPANY
  11. Install the panel trim (2).
  12. Install the 3 panel trim nuts (1) and tighten to 6 N.m (53 lb in).
  13. Battery Negative Cable»Connect — Battery Negative Cable Disconnection and Connection 
  14. Install Rear Compartment Floor Stowage Trim Compartment Rear Compartment Floor Stowage Trim Compartment Replacement
  15. Enable the high voltage system. High Voltage Enabling