Installation Procedure
- Install Generator (2)
- Install Generator Bolt (1) (Qty: 2) and tighten to 58 N.m (43 lb ft)
- Install Drive Belt Tensioner (3) - Drive Belt Tensioner Replacement - Accessory
- Install Starter Solenoid Cable (2)
- Install Generator Fastener (1) and tighten to 15 N.m (11 lb ft)
- Install Electrical Connector (3)
- Install Radiator Surge Tank Replacement (LT1) (6)
- Install Radiator Outlet Hose Replacement (LT1 V18 V03) (1)
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution