Installation Procedure
- Install Battery Distribution Engine Compartment Fuse Block (3)
- Tighten Battery Positive Post Clamp Nut (1) to 5 N.m (44 lb in)
- Close Battery Positive Post Cover (2)
- Install Generator Battery Control Wiring Harnesses (3) (Qty: 3)
- Install Battery Positive Cable (2)
- Install and tighten Battery Distribution Engine Compartment Fuse Block Nuts (1) (Qty: 3) to 15 N.m (11 lb ft)
- Connect Electrical Connectors (2) (Qty: 2)
- Install Fuse Block Cover (1)
- Install Front Fender Rear Upper Brace. Refer to FRONT FENDER REAR UPPER BRACE REPLACEMENT
- Connect the battery negative cable. Refer to BATTERY NEGATIVE CABLE DISCONNECTION AND CONNECTION (DUAL BATTERY)BATTERY NEGATIVE CABLE DISCONNECTION AND CONNECTION (SINGLE BATTERY)
Fig 1: Battery Positive Post Cover, Clamp Nut And Battery Distribution Engine Compartment Fuse Block
CAUTION:
Refer to FASTENER CAUTION .
Fig 2: Battery Distribution Engine Compartment Fuse Block Nuts, Battery Positive Cable And Generator Wiring Harnesses