Circuit/System Testing
Secondary Air Injection Shutoff and Check Valve Malfunction
- Ignition OFF, disconnect the KR26 secondary air injection solenoid valve relay.
- Verify a test lamp illuminates between the B+ circuit terminal 30 and ground.
- If the test lamp does not illuminate and the circuit fuse is good
- Test for less than 2 Ω in the B+ circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, verify the fuse is not open and there is voltage at the fuse.
- If the test lamp does not illuminate and the circuit fuse is open
- Ignition OFF.
- Test for infinite resistance between the B+ circuit and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Disconnect the harness connector at the appropriate Q29 secondary air injection solenoid valve.
- Test for infinite resistance between the control circuit terminal 5 and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Test or replace the Q29 secondary air injection solenoid valve.
- If the test lamp illuminates
- Disconnect the harness connector at the appropriate Q29 secondary air injection solenoid valve.
- Ignition OFF and all vehicle systems OFF, it may take up to 2 minutes for all vehicle systems to power down. Test for less than 10 Ω between the Q29 secondary air injection solenoid valve ground circuit terminal 4 and ground.
- If 10 Ω or greater
- Ignition OFF.
- Test for less than 2 Ω in the ground circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, repair the open/high resistance in the ground connection.
- If less than 10 Ω
- Connect the harness connector at the Q29 secondary air injection solenoid valve.
- Connect a 15 A fused jumper wire between the B+ circuit terminal 30 and the control circuit terminal 87.
- Verify the Q29 secondary air injection solenoid valves are activated.
- If a Q29 secondary air injection solenoid valve does not activate
- Ignition OFF, disconnect the harness connector at the appropriate Q29 secondary air injection solenoid valve.
- Test for less than 2 Ω in the control circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, test or replace the Q29 secondary air injection solenoid valve.
- If the Q29 secondary air injection solenoid valves activate
- Test or replace the KR26 secondary air injection solenoid valve relay.
Secondary AIR Injection Pump Malfunction
- Ignition OFF, disconnect the KR25 secondary air injection pump relay.
- Verify a test lamp illuminates between the B+ circuit terminal 30 and ground.
- If the test lamp does not illuminate and the circuit fuse is good
- Ignition OFF
- Test for less than 2 Ω in the B+ circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, verify the fuse is not open and there is voltage at the fuse.
- If the test lamp does not illuminate and the circuit fuse is open
- Ignition OFF.
- Test for infinite resistance between the B+ circuit and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Disconnect the harness connector at the G21 secondary air injection pump.
- Test for infinite resistance between the control circuit terminal A and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance
- Test or replace the G21 secondary air injection pump.
- If the test lamp illuminates
- Disconnect the harness connector at the G21 secondary air injection pump.
- Ignition OFF and all vehicle systems OFF, it may take up to 2 minutes for all vehicle systems to power down. Test for less than 10 Ω between the G21 secondary air injection pump ground circuit terminal B and ground.
- If 10 Ω or greater
- Ignition OFF.
- Test for less than 2 Ω in the ground circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, repair the open/high resistance in the ground connection.
- If less than 10 Ω
- Connect the harness connector at the G21 secondary air injection pump.
- Connect a 60 A fused jumper wire between the B+ circuit terminal 30 and the control circuit terminal 87.
- Verify the G21 secondary air injection pump is activated.
- If the G21 secondary air injection pump does not activate
- Ignition OFF, disconnect the harness connector at the G21 secondary air injection pump.
- Test for less than 2 Ω in the control circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω,
- Test or replace the G21 secondary air injection pump.
- If the G21 secondary air injection pump activates
- Test or replace the KR25 secondary air injection pump relay.
NOTE:
To prevent the secondary air injection pump from overheating, do not operate the pump consecutively for greater than 2 minutes. The pump is provided with a thermal protector that will automatically reset when allowed to cool.
Secondary Air Injection System Pressure Not In Range
- Verify the following conditions do not exist:
- Hoses/pipes restricted or blocked
- Hoses/pipes leaking or disconnected
- Plugged secondary air injection pressure sensor port (integral to shutoff and check valve)
- Damaged secondary air injection shutoff and check valve
- Restricted or blocked cylinder head secondary air injection inlet ports and passages
- If a condition is located
Repair or replace the affected component as necessary.
- If all components test normal
- Disconnect the secondary air injection hoses/pipes from the Q29 secondary air injection solenoid valves.
- Ignition ON, command the Air Pump ON with a scan tool.
- Verify airflow to the Q29 secondary air injection solenoid valves.
- If no airflow
Replace the G21 secondary air injection pump.
- If airflow
- If no airflow
- Replace the appropriate Q29 secondary air injection solenoid valve or valves.