Assembly Procedure
WARNING: This page is about a different car, the 2011 GMC Savana and 2011 Chevrolet Chevy Express. However, it is still accessible from the selected car via links, so may be relevant.
- Ensure the flow control spring (5) does not fall out of the pump housing (1).
- Lubricate the NEW O-ring seal (3) with power steering fluid.
- Install the O-ring seal onto the connector and fitting assembly (2).
- Install the control valve assembly (4).
- Install the connector and fitting assembly (2) and tighten to 62 N.m (46 lb ft).
CAUTION:
Refer to Fastener Caution .