Circuit/System Testing
- Ignition OFF, disconnect the K27 fuel pump control module harness connector.
- Ignition OFF, and all vehicle systems OFF. It may take up to 2 minutes for all vehicle systems to power down. Test for 0 V on the enable circuit terminal 13 of the fuel pump control module.
- If greater than the specified value, test for a short to voltage on the enable circuit. If the circuit/connections test normal, replace the K20 ECM.
- Ignition ON, command the fuel pump ON with a scan tool. Test for B+ on the enable circuit terminal 13 of the fuel pump control module.
- If less than the specified range, test for a short to ground or an open/high resistance on the enable circuit. If the circuit/connections test normal, replace the K20 ECM.
- Ignition ON, test for 2-3 V on the enable circuit terminal 13 of the fuel pump control module.
- If not within the specified range, replace the K20 ECM.
- If all circuits/connections test normal, replace the K27 fuel pump control module.