Installation Procedure
- Use the J 29193
in order to connect the connecting rod to the pitman arm ball stud. See Special Tools .
Ensure that the seal is on the stud.
Tighten: Tighten the J 29193 to 54 N.m (40 lb ft) in order to seat the tapers.
Remove the J 29193 . See Special Tools .
- Install the new prevailing torque nut (1) to the pitman arm (3) ball stud.
Tighten: Tighten the nut to 62 N.m (48 lb ft).
- Use the J 29193
in order to install the connecting rod (4) ball stud to the relay rod (2). See Special Tools .
Ensure that the seal is on the stud.
Tighten: Tighten the J 29193 to 54 N.m (40 lb ft) in order to seat the tapers.
- Remove the J 29193 . See Special Tools .
- Install the new prevailing torque nut (1) to the ball stud.
Tighten: Tighten the nut to 47 N.m (35 lb ft).
- Lower the vehicle.
- Adjust the toe-in. Refer to Front Toe Adjustment in Wheel Alignment.
NOTE:
Refer to Fastener Notice in Cautions and Notices.