Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Chevrolet >> 2003 >> Tracker 2D Utility, RWD, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 105 (Automatic Transaxle Servicing) >> Removal & Installation >> Shift Control Cable >> Installation

Shift Control Cable: Installation

WARNING: This page is about a different car, the 2003 Pontiac Grand Am and 2003 Oldsmobile Alero. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the cable through the cowl and carpet.
  2. Install the cable grommet and the bolts in the cowl. Tighten the grommet bolts to specifications. See TORQUE SPECIFICATIONS  .
  3. Install the cable (4) at the shift control assembly (3). See Figure .
  4. Install the center control. See Figure .
  5. Install the cable at the transaxle cable brackets (1). See Figure .
  6. Install the cable at the transaxle selector lever (2).
  7. Install the negative battery cable.
  8. Adjust the cable as follows:
    1. Place the gearshift lever in the Neutral position.
    2. Place the transaxle in Neutral by rotating the selector shaft clockwise from Park through Reverse to Neutral.
    3. Pull the cable locking clip fully upward at the floor shift control. See Figure .
    4. Push the on the cable adjuster in order to adjust cable in the cable mounting bracket.