Installation Procedure
Generator (2) - Install
- Generator Bolt (1) - Install and tighten [3x] 58 N.m (43 lb ft)
Electrical Connector (4) - Connect
- Starter Solenoid Cable (3) - Install
- Generator Nut (2) - Install and tighten 15 N.m (11 lb ft)
- Protective Cap (1) - Install
Charge Air Cooler Coolant Pump (1) - Install - Charge Air Cooler Coolant Pump Replacement (LF4)
Power Brake Booster Pump (1) - Install - Power Brake Booster Pump Replacement
Turbocharger Coolant Return Pipe (1) - Install - Turbocharger Coolant Return Pipe Replacement (LF4 - Bank 1)Turbocharger Coolant Return Pipe Replacement (LF4 - Bank 2)
- Install the drive belt. Drive Belt Replacement (LF4)
- Drivetrain and Front Suspension Frame - Install - Drivetrain and Front Suspension Frame Removal and Installation (LF4)
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection
CAUTION:
Refer to Fastener Caution