Component Testing
- Install a 20A fused jumper wire between the control terminal 1 and 12 V. Momentarily install a jumper wire between the control terminal 3 and ground. The liftgate latch assembly should perform the CINCH or RELEASE function.
- If the function does not perform as specified, replace the liftgate latch assembly.
- Reverse the jumper wires; the liftgate latch assembly should perform the RELEASE or CINCH function.
- If the function does not perform as specified, replace the liftgate latch assembly.