Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Cadillac >> 2005 >> DeVille Protection Series >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - Introduction >> Repair Instructions >> Secondary Air Injection (AIR) Pump Intermediate Pipe/Hose Replacement - Bank 2 >> Installation Procedure

Installation Procedure

    Fig 1: View Of Bank 2 Intermediate Pipe/Hose
    GM784721Courtesy of GENERAL MOTORS CORP.
  1. Install the bank 2 intermediate pipe/hose.
  2. Install the pinch clamp connecting the bank 2 intermediate pipe/hose to the bank 2 shut-off valve.
  3. Raise the vehicle. Refer to Lifting and Jacking the Vehicle in General Information.
  4. Install the bank 2 intermediate pipe/hose and clamp to the AIR pump.
  5. Lower the vehicle.