Installation Procedure
- Install the bank 2 intermediate pipe/hose.
- Install the pinch clamp connecting the bank 2 intermediate pipe/hose to the bank 2 shut-off valve.
- Raise the vehicle. Refer to Lifting and Jacking the Vehicle in General Information.
- Install the bank 2 intermediate pipe/hose and clamp to the AIR pump.
- Lower the vehicle.