Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Buick >> 2005 >> Allure CXS >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Engine Control System - 3.8L - Introduction (2 Of 2)) >> Repair Instructions >> Throttle Body Assembly Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
    Fig 1: Identifying Throttle Body Assembly (L26)
    GM911046Courtesy of GENERAL MOTORS CORP.
  1. Install the new gasket.
  2. Install the throttle body assembly (1).
  3. NOTE: Refer to Fastener Notice in Cautions and Notices.
  4. Install the throttle body bolts (5) and the nuts (4).

    Tighten:  Tighten the bolts and the nuts to 10 N.m (89 lb in).

  5. Connect the throttle body electrical connector.
  6. Install the air cleaner intake duct. Refer to Air Cleaner Intake Duct Replacement .
  7. Install the fuel injector sight shield. Refer to Fuel Injector Sight Shield Replacement in Engine Mechanical - 3.8L.
  8. Fill the cooling system. Refer to Draining and Filling Cooling System (LY7) or Draining and Filling Cooling System (L26) in Engine Cooling.