Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Audi >> 2018 >> S5 Premium Plus, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 249 (Charging System (Battery, Starter, Generator) And Cruise Control) >> 27 Starter, Generator And Cruise Control >> Battery, Checking >> Visual Inspection

Visual Inspection

WARNING: This page is about a different car, the 2019 Audi S5 Sportback, 2019 Audi A5 Sportback, 2018 Audi S5 Sportback, and 2018 Audi A5 Sportback. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:

Risk of injury. Follow all warning messages and safety precautions. Refer to WARNINGS AND SAFETY PRECAUTIONS .

Before any extensive measurements are taken, visually inspect the exterior of the battery, the connections, and the secure installation of the Battery -A-.

CAUTION:
  • An improperly secured Battery -A- can lead to damage.
  • Excessive vibration due to an improperly secured battery will reduce the battery service life, and the battery hold-down bracket could damage the battery housing and lead to electrolyte leakage.
  • Make sure the Battery -A- is secure. Tighten the mounting bolt to the tightening specification, if necessary.

Visual Inspection Points