Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Audi >> 2013 >> Q7 Prestige >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> 3.0L - Generic Scan Tool - Engine Code: CNRB - Transmission DTC Tables & Diagnostic Procedures >> St Generic Scan Tool >> Diagnosis And Testing >> Diagnostic Procedures >> Fuel Injectors, Checking

Fuel Injectors, Checking

Function 

The Cylinder Fuel Injectors -- are controlled by the Engine Control Module -J623- and mounted normal in the cylinder head. The fuel injectors spray high-pressure atomized fuel directly into the combustion chamber.

Special tools and workshop equipment required 

Test Requirements 

Test Procedure 

Step Procedure Result / Action to Take
1
  • PERFORM: Preliminary Check to verify the customers complaint. Refer to PRELIMINARY CHECK
-- Was complaint verified?
-- YES:
  • GO TO: Step
-- NO:
  • Gather more Information from customer about the complaint
  • IGNITION: OFF
  • DISCONNECT: Faulty Fuel Injector -- harness connector.
  • CHECK: The faulty Fuel Injector -- terminals for resistance. (* Refer to the wiring diagram for proper terminal locations *).
  • SPECIFIED VALUE: 5 - 8 Ω (@ approx. 20° C)
-- Was value obtained?
-- YES:
  • GO TO: Step
-- NO:
  • CHECK: wiring for opens, high resistance, short or electrical connector for damage, corrosion, loose or broken terminals
  • REPAIR: faulty wiring or connector
  • GO TO: Step
  • REMOVE: Engine Control Module - J623-. Refer to appropriate service information.
  • CHECK: Faulty Fuel Injector -- harness connector terminals to the Engine Control Module - J623- harness connector terminals. (* Refer to the wiring diagram for proper terminal locations *).
  • SPECIFIED VALUE: 0.5 Ω (± 0.3 Ω)
-- Was value obtained?
-- YES:
  • REPLACE: Engine Control Module -J623- Refer to appropriate repair information
  • GO TO: Step
-- NO:
  • CHECK: wiring for open, high resistance, short or electrical connector for damage, corrosion, loose or broken terminals
  • REPAIR: faulty wiring or connector
  • GO TO: Step
  • Final Procedure 
  • Perform a road test to verify repair.
  • Do any DTC's return:
-- YES: -- NO:
  • Repair is complete, Generate readiness code. Refer to READINESS CODE .
  • Return vehicle to Customer