Mike's Workshop Manuals: Service manuals for every vehicle
Home >> Alfa Romeo >> 2017 >> Giulia Base, AWD >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> Center, Power Distribution (PDC) >> Removal And Installation >> 2.9L Front

2.9L Front

REMOVAL 

  1. Disconnect and isolate the negative battery cable.
    GC0197775Courtesy of CHRYSLER GROUP, LLC
  2. Release the retainers (1b) and open the Power Distribution Center (PDC) cover (1a).
    GC0197468Courtesy of CHRYSLER GROUP, LLC
  3. Note the terminal ends relative to the PDC to understand where they will connect upon installation.
  4. Remove the cable fasteners and cables (2).
  5. Remove the PDC bracket fasteners (3a).
  6. Remove the PDC.
    GC0198094Courtesy of CHRYSLER GROUP, LLC
  7. If necessary remove the two PDC bracket to body fasteners (1a) and remove the bracket (1b) by releasing it from the retainers (1c).

INSTALLATION 

  1. If removed position the PDC bracket in position.
    GC0198094Courtesy of CHRYSLER GROUP, LLC
  2. Position the bracket (1a) and engage it to the retainers (1b), then tighten the two PDC to body fasteners (1c) to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
  3. Inspect the PDC and the wire harness terminal integrity.
    GC0197455Courtesy of CHRYSLER GROUP, LLC
  4. Position the PDC (1a), install and tighten the fasteners (1b) to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
  5. Connect the cables (2a) to the PDC and tighten the cable fasteners to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
    GC0197448Courtesy of CHRYSLER GROUP, LLC
  6. Position the PDC cover (1a) and secure all retainers (1b).
  7. Connect the negative battery cable.