Inspection Outline
- The components to be tested are indicated by a dotted line.
| Inspection Items | Work Items | |
|---|---|---|
| a | Turbocharger Bypass Control Solenoid Valve | Turbocharger Bypass Control Solenoid Valve Component Inspection |
| b | External Circuit | IG1 (ABV) Circuit Inspection |
| ABV Shorted Wire Inspection | ||
| c | PCM | PCM Inspection |